Two new facilities to begin construction on Beale AFB

Chief Master Sgt. (Retired) John Evalle, Congressman John Garamendi’s military and veteran liaison, speaks to Team Beale during a groundbreaking ceremony initiating the official start of construction of the 9th Civil Engineer Squadron Administration and Operations Facility and the 548th Intelligence, Surveillance, and Reconnaissance Group Distribution Common Ground System Facility at Beale Air Force Base, Calif., April 3, 2015. The 9th CES structure is planned to be a 43,000 square foot facility, costing $15.9 million and the DCGS facility is planned to be a two-story 85,000 square foot structure, costing $53.7 million. (U.S. Air Force photo by Airman 1st Class Ramon A. Adelan/Released)

PHOTO BY: Airman st Class Ramon A. AdelanReleased
VIRIN: 150403-F-HK496-027.JPG
FULL SIZE: 2.97 MB
Additional Details

No camera details available.

IMAGE IS PUBLIC DOMAIN

Read More

This photograph is considered public domain and has been cleared for release. If you would like to republish please give the photographer appropriate credit. Further, any commercial or non-commercial use of this photograph or any other DoD image must be made in compliance with guidance found at https://www.dimoc.mil/resources/limitations, which pertains to intellectual property restrictions (e.g., copyright and trademark, including the use of official emblems, insignia, names and slogans), warnings regarding use of images of identifiable personnel, appearance of endorsement, and related matters.